Large-Scale Onshore Wind Opportunity in England

Large-Scale Onshore Wind Opportunity in England

Onshore Wind Opportunity
Eaubrink

Eaubrink is a large-scale greenfield opportunity in England with an indicative onshore wind capacity of up to 192 MW. The site extends across approximately 3,400 hectares, or 8,400 acres, and could potentially accommodate up to 40 wind turbines.

Initial assessments indicate a mean wind speed of 7.7 m/s at a reference hub height of 83 metres. Caeli is preparing Eaubrink for introduction to qualified onshore wind developers through the Caeli marketplace.

The Eaubrink data room is scheduled to open on 31 August 2026 at 12:00 PM BST. Interested project developers can book a project presentation now to learn more about the site, the available information and the planned tender process.

All figures are indicative and remain subject to further technical, grid, planning, environmental, land and commercial assessment.

Eaubrink | Key Facts

Project and location

  • Project: Eaubrink
  • Country: England
  • Project type: Large-scale greenfield onshore wind opportunity
  • Site area: Approximately 3,400 ha / 8,400 acres
  • Current phase: Project preparation and assessment
  • Data room opening: 31 August 2026 at 12:00 PM BST
  • Marketplace availability: August 2026

Indicative project potential

  • Indicative total capacity: Up to 192 MW
  • Potential number of turbines: Up to 40
  • Mean wind speed at hub height: 7.7 m/s
  • Reference hub height: 83 m

Project information and access

  • Marketplace: The opportunity will be introduced to qualified project developers through the Caeli marketplace
  • Data room: Further project information will be made available through the Eaubrink data room from 31 August 2026 at 12:00 PM BST
  • Access: Data room access will be coordinated with interested and qualified project developers following the relevant onboarding and confidentiality process
  • Tender process: Further information on the planned tender process and timetable will be shared with interested parties
  • Project presentation: Project developers can book a presentation with the Caeli team to discuss the site, the currently available information and the next steps
Aerial view of a green agricultural field, suitable for wind power development.

Part of a Growing UK Project Pipeline

Eaubrink is the first opportunity in a growing pipeline of UK onshore wind sites being assessed by Caeli.

Two further priority sites in England and Wales are currently undergoing assessment, alongside additional early-stage opportunities across England and Scotland.

The individual sites are at different stages of assessment. Their potential and suitability will be reviewed further before they progress to the Caeli marketplace.

By registering an interest in the wider pipeline, project developers can receive information about future opportunities relevant to their regional focus and development strategy.

The Caeli Marketplace

The Caeli marketplace connects landowners and project developers through a transparent and competitive process.

For project developers, it provides access to new land and project opportunities supported by digital site analysis and clearly presented project information.

For Eaubrink, Caeli coordinates the introduction of the opportunity, access to available project information and the subsequent tender process.

Project developers that are not yet registered with Caeli can also schedule an introductory meeting to learn more about the marketplace and onboarding process.

Important Information

The capacity, turbine number, wind resource and other project figures presented on this page are indicative estimates based on the information and assessments currently available.

They do not represent a planning consent, grid connection offer, confirmed turbine layout, investment recommendation or guarantee of development feasibility.

The site remains subject to further assessment, including technical, grid, planning, environmental, aviation, land and commercial due diligence. The project scope and development potential may change as further information becomes available.

Current Opportunities on the Caeli Marketplace

Site in England

Projected Capacity 17.1 MW Wind Farm Area 55.1 ac Capacity Factor 30 % IRR Before Lease 7.7 % Available soon

Site in Wales

Projected Capacity 28.8 MW Wind Farm Area 170.3 ac Capacity Factor 30 % IRR Before Lease 6.6 % Available soon

Site in England

Projected Capacity 22.8 MW Wind Farm Area 186.6 ac Capacity Factor 30 % IRR Before Lease 9.6 % Available soon

Schedule an Eaubrink Project Presentation

The Eaubrink data room is scheduled to open on 31 August 2026 at 12:00 PM BST.